|
| |
|
|
| |
|
|
| |
Sort By Classification :
|
| |
Infrastructure and Utilities |
|
| |
Project Name |
| EIA for Projek Membina Jalan Kota Marudu-Marak, Parak-Melinsau-Poring, Ranau, Sabah (110km) – Pakej 2 (Marak Parak-Togop (30km) |
|
| EIA for Projek Membina Jalan Kota Marudu-Marak, Parak-Melinsau-Poring, Ranau, Sabah (110km) – Pakej 1 (Kota Marudu-Marak Parak (30km) |
|
| EIA for Proposed Infrastructure Works at Kidurong Industrial Area (KINDA ) II, Bintulu, Sarawak |
|
| EIA for Proposed Riverfront Esplanade (Phase 1) at Song, Kapit, Sarawak |
|
| DEIA for Proposed 500kv Transmission Lines from Jimah Power Plant – Lenggeng – Olak Lempit |
|
| EIA for Proposed Weir Across Sg. Sarawak Kiri Downstream of Batu Kitang Intakes, Kuching, Sarawak |
|
| EIA for Proposed Kuching Family Park at Jalan Sultan Tengah, Santubong, Kuching, Sarawak |
|
| EIA for Proposed Batang Igan Bridge and Connecting Roads in Sibu, Sarawak |
|
| EIA for Proposed Kampung Jepak Extension Scheme, Bintulu, Sarawak |
|
| EIA for Proposed Batang Baram Bridge Development, Miri, Sarawak |
|
| EIA for Waterfront Extension Development Project, Kuching, Sarawak |
|
| EIA for Feeder Road, Kpg. Puruh Garung - Kpg. Padawan, Sarawak |
|
| EIA for Riverfront Development, Kuching, Sarawak |
|
|
| |
International Clients |
|
| |
Project Name |
| DEIA for Proposed Malaysia Iron Ore Project, Teluk Rubiah, Perak, Malaysia |
|
| Environmental Studies for Proposed Biodiesel Facility at Lahad Datu, Sabah |
|
|
| |
Page
1
2
3
4
5
6
7
[8]
9
10
11
12
13
14
|
|
|
|